The following service efforts should be assumed when an app is made running live at a machine by one of our service technicians.

 

App Effort   Notes

TS-PM

1x

E65 71023 or E65 71100

Reference value for 1 NC program with max. 16 tools at a machine with 1 spindle or max. 10 tools at a double spindle machine. Further assumption is a machining time per workpiece of at about 20 min.

TS-Wear

 

 

If TS-PM is installed and configured at the same machine, TS-Wear is explained to the customer and roughly configured within the above work.

Additional efforts should only be assumed, if the tool wear has special attention. For this case it is beneficial, if the customer has 2-3 worn and sharp tools at the hand, when the KOMET technician arrives. The production must be in a stable state (no program changes) when the wear limits are configured.

TS-AFC

0.5x

E65 76010 or E65 71010

Reference value for 1 NC program with max. 8 tools at a machine with 1 spindle or 5 tools at a double spindle machine. Further assumption is a machining time per workpiece of at about 20 min.

CD-xDim
(CD303)

 

1x
 

0.5x

E65 76010 or E65 71010 for integration

E65 76010 or E65 71010 for setup of limits

Keep in mind, as written in the standard quotation text blocks:

The mounting of the sensor can - in dependency of the machine - take much time. It is highly recommented (and written in our quotations as duty of the customer), that the maintenance of the customer installs the acceleration sensor before the technician from KOMET does the rest of the work.

This decreases the duration of the machine stand still time by moving the sensor integration in a time interval of regular machine maintenance.

the maintenance of the customer shall mount the acceleration sensor, before our technician arrives.

TS-MDA

0.5x

E65 76010 or E65 71010

Reading status data from a ToolScope, looking at the raw data, feed the raw data into an Excel example.

TS-TCLog

0.5x

E65 76010 or E65 71010

Reference value for setting up the tool change counter for 1 NC program with max. 16 tools at a machine with 1 spindle or max. 10 tools at a double spindle machine. Further assumption is a machining time per workpiece of at about 20 min.

Reading tool change data from a ToolScope, looking at the raw data, feed the raw data into an Excel example.

TS-Cloud 0.5x E65 76010 or E65 71010 Configure at least one data transmission from the ToolScope to a location on a customer server.
TS-QRep 0.25x E65 76010 or E65 71010 Enable the PDF creation. Add data, which is existing in the sensor signals of the ToolScope and additionally wanted in the PDFs to the process attributes.
TS-CM 1x E65 76010 or E65 71010 Instruction and explaining the functionality

 

The efforts should be quoted / offered / ordered together with the apps, if there is no personnel at the end customer, which is used in using the apps.